NYC DOB record · B01472556-I1

198 Court Street

198 Court Street, Brooklyn, NY 11201

Alteration filing in Carroll Gardens-Cobble Hill-Gowanus-Red Hook, Brooklyn. The latest DOB status is approved.

A plan examiner has approved the application. A permit still has to be issued before work can begin. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Nov 20, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B01472556-I1

198 Court Street

Brooklyn, NY 11201

Alteration filing · status dated Nov 18, 2026

Current record
Approved
Proposed scale
4 stories
Dwelling units
14
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B01472556-I1 as a alteration filing at 198 Court Street, Brooklyn, NY 11201. Its latest published status category is Approved, dated Nov 18, 2026. The filing records 4 proposed stories and 14 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Nov 18, 2026
Proposed scale
4 proposed stories and 14 proposed dwelling units
The building, not the filingopen housing violations, what it sold for, apartment sizes and every filing at BIN 3003278Applicant of recordSee the 12 filings that name CCB Engineering LLC
FiledOct 16, 2026
Current recordApproved
Proposed scale4 stories
Recorded cost$50,000

What the filing says

A public-record reading of the proposed work.

Sidewalk vault repair work at exisiting 4 story mixed use building as per plan. No change in use, egress, or occupancy. Inorder to satisfy IED direction. Work was done in compliance with the Immediate Emergency Declaration (IED) that was issued.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 4-story walk-up apartment building built in 1898, with 14 homes, on a 4,193 sq ft lot.

Built
1898
Floors
4
Residential units
14
Building type
Walk-up apartment building
Land use
Mixed residential and commercial
Zoning district
R6
Lot area
4,193 sq ft
Building area
8,736 sq ft
Historic district
Cobble Hill Historic District

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Nov 20, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 7 open notices on record for this building, out of 18 notices on file; the most recent was issued Sep 28, 2026.

  • Immediate

    Issued Sep 28, 2026 — REMEDY:ERECT APPROX 20' OF U SHAPED TIGHT BOARD CONSTRUCTION FENCE AS FOLLOWS. EXP.1 (COURT STREET) 10'AND TO RETURN TO BUILDING APPROX 5' ON BOTH SIDES TO MAKE AREA SAFE TO PUBLICAND PEDESTRIANS DIRECTLY IN FRONT OF OCTAVIA COFFEE SHOP

  • Construction

    Issued Sep 26, 2026 — ENGINEERS REPORT REQUESTED DUE TO SIDEWALK VAULT HAS COLLAPSED.

  • Local law 62/91 - boilers

    Issued Feb 10, 1997

  • 4 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Nov 20, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B01472556-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. Current status updated

    The latest recorded filing status is “Approved.”

    03

For scale: half of DOB filings are permitted within 23 days of being filed and a quarter take longer than 4 months, measured across 99,111 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B01472556-I1
BBL
3003020040
Review type
Standard Plan Examination
Existing stories
4
Proposed stories
4
Existing dwelling units
14
Proposed dwelling units
14
Structural work