What the filing says
A public-record reading of the proposed work.
Interior alterations of existing commercial space to include partition and finishes work. no change to use, occupancy or egress
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 29-story condominium built in 1977, with 269 homes, on a 17,514 sq ft lot.
- Built
- 1977
- Floors
- 29
- Residential units
- 269
- Building type
- Condominium
- Land use
- Mixed residential and commercial
- Zoning district
- C4-6A
- Lot area
- 17,514 sq ft
- Building area
- 216,606 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 24, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 5 open notices on record for this building, out of 119 notices on file; the most recent was issued Oct 16, 2024.
- Fail to certify class
Issued Oct 16, 2024 — FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
- Construction
Issued Mar 20, 2023 — THE DOB HEREBY ORDERS YOU TO STOP ALL WORK UNDER JOB #101470258 IMMEDIATELY - EXCEPT TO MAKE SITE SAFE - DUE TO REVOCATION OF APPROVAL AND PERMIT
- Construction
Issued Mar 20, 2023 — THE DOB HEREBY ORDERS YOU TO STOP ALL WORK UNDER JOB #101470258 IMMEDIATELY - EXCEPT TO MAKE SITE SAFE - DUE TO REVOCATION OF APPROVAL AND PERMITS
2 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 24, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01367862-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 68,520 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01367862-I1
- BBL
- 1011417502
- Postal code
- 10023 · 428 filings
- Review type
- Professional Certification
- Existing stories
- 29
- Proposed stories
- 29
- Existing dwelling units
- 263
- Proposed dwelling units
- 263