What the filing says
A public-record reading of the proposed work.
Reach-1: PS27.5 sheet piles, soil-mix trench seepage barrier, micropiles, 3' dia drilled shafts, open cut excavation, 4" stabilization slab, flowable fill/jet grout. Sheeting/shoring deferred under separate DOB filing.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 8-story educational building built in 1980, on a 223,935 sq ft lot.
- Built
- 1980
- Floors
- 8
- Residential units
- 0
- Building type
- Educational building
- Land use
- Public facilities and institutions
- Zoning district
- C6-4
- Lot area
- 223,935 sq ft
- Building area
- 780,000 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 30, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 10 open notices on record for this building, out of 174 notices on file; the most recent was issued Mar 17, 2025.
- Construction
Issued Mar 17, 2025 — EMERGENCY WORK ORDER AS NOTED AT TIME OF INSPECTION @ DESIGNATED UNSAF BLDG AS PER TECHNICAL REPORT UNSAFE TR6-90041-9C-11 DETACHED/SEPARATED PARAPET ON EXP(4)EAST ELE,PANEL DISCONNECT FROM PARAPET STEP CRACKS BULG OUTWARD. REMEDY:TAKE SAFE MEAS AS PER IRCNY 103-04 PROVIDE PUBLIC PROTECTION ALL ALL EXPOSURES. EXP(1)S,EXP(2)W,EXP(3)NORTH,EXP94) EAST
- Hazardous condition (facade)
Issued Feb 20, 2025 — CYCLE 9C UNSAFE REPORT FILED
- Failure to correct swarmp conditions (facade)
Issued Feb 20, 2025 — CYCLE 9C FAILURE TO CORRECT SWARMP CONDITIONS
7 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 29, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01391946-S2.
- Current status updated02
The latest recorded filing status is “Pending Plan Examiner Assignment.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 73,707 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01391946-S2
- BBL
- 1001420050
- Postal code
- 10013 · 588 filings
- Review type
- Standard Plan Examination
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 0
- Proposed dwelling units
- 0