What the filing says
A public-record reading of the proposed work.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the NYC building code. live load 300psf.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 5-story condominium built in 2009, with 15 homes, on a 5,000 sq ft lot.
- Built
- 2009
- Last altered
- 2009
- Floors
- 5
- Residential units
- 15
- Building type
- Condominium
- Land use
- Elevator apartments
- Zoning district
- R6B
- Lot area
- 5,000 sq ft
- Building area
- 9,747 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 17, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 3 open notices on record for this building, out of 18 notices on file; the most recent was issued Mar 16, 2026.
- Construction
Issued Mar 16, 2026 — EMERGENCY WORK ORDER REQ'D-OBSVD SPALLING @ SEVERAL BALCONY SLABS @ EXP1. @ 3FL BEAR 1/4 CORNER. OBSVD LOOSE/HANGING TILE @ RISK OF FALLING ONTO PUBLIC SIDEWALK. OWNER TO IMMED RETAIN DOB REG GC TO INSTALL S/W SHED APPROX 25' ALONG THE ENTIRELY OF EXP1 ON HURAN ST START WORK IMMED & DONTINUE DAILY UNTIL COMPLETE
- Construction
Issued Mar 16, 2026 — CORRECTIVE ACTION PLAN REQ'D-OBSVD SPALLING MASONRY @ EXP1 BALCONIES OBSVD LOOSE/DELAMINATED MASONRY @ FLOOR BALCONY CLOSE TO 1/4 CORNER OWNER TO IMMED RETAIN REG DESIGN PROF IN GOOD STANDING W/DOB&NYS TO EVAL ENTIRE BLDG & SUBMIT A CORRECTIVE ACTION PLAN BY 4/16/2026 ADDRESSING ALL CONDITION W/PLANS,PHOTOS RECOMMENDING A TIME T/BE COMPL
- Local law 62/91 - boilers
Issued Aug 16, 1993
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 21, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B01373964-I1.
- First permit date recorded02
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated03
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,798 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B01373964-I1
- BIN
- 3425466
- BBL
- 3025237504
- Postal code
- 11222 · 3150 filings
- Review type
- Professional Certification
- Existing stories
- 3
- Proposed stories
- 3
- Existing dwelling units
- 15
- Proposed dwelling units
- 15