What the filing says
A public-record reading of the proposed work.
Application filed herewith to propose new plumbing systems as per plans
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 1-story garage or fuel station built in 1931, on a 25,000 sq ft lot.
- Built
- 1931
- Floors
- 1
- Residential units
- 0
- Building type
- Garage or fuel station
- Land use
- Parking facilities
- Zoning district
- M2-1
- Lot area
- 25,000 sq ft
- Building area
- 24,575 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 14, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 11 open notices on record for this building, out of 15 notices on file; the most recent was issued Oct 14, 2025.
- Construction
Issued Oct 14, 2025 — EWO: 1 STORY STRUCTURE W/MASONRY BRICK, EXTERIOR FACADE @ EXP1 VERTICA & HORIZONTAL CRACKS CAUSE SEPARATION & LOOSE MORTAR BETWEEN BRICK IN DANGER OF FALLING INTO SIDEWALK PUBLIC. REMEDY:IMMEDIATELY INSTALL ADEQUATE SAFE MEASURES TO PROTECT PUBLIC. RETAIN NYS PROFESSIONAL ENG TO EVALUATE FACADE STABALIZING/REPAIRING THE STRUCTURE BY 10/28/2025
- Construction
Issued Dec 5, 2023 — FTM.ON 11/9/23,OBSRVD MASONRY WALLS IN STATE OF DISREPAIR W/DIAGONAL CRACKS&IMPROPERLY ENCLOSED OPENING W/UNENGINEERED LINTEL.COMPLY IMMEDIATELY WITH CONTROL #343309
- Construction
Issued Dec 5, 2023 — FTM.ON 11/9/23,OBSRVD ROOF IN STATE OF DISREPAIR W/WATERDAMAGE & SAGGNG LEAVNG TRSSES IMPROPERLY BRACED.OBSRVD MASONRY PERIMETER WALLS IN STATE OF DISREPAIR W/DIAGONAL CRCKS THROUGHOUT.COMPLY IMMEDIATELY WITH CONTROL #343306
8 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B00268984-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “LOC Issued.”
- Sign-off date recorded05
DOB lists a sign-off date for this filing.
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 73,707 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B00268984-I1
- BIN
- 3345652
- BBL
- 3005540014
- Postal code
- 11231 · 2788 filings
- Review type
- Professional Certification
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 0
- Proposed dwelling units
- 0