What the filing says
A public-record reading of the proposed work.
Minor interior renovation in apt 9c on floor 009 as per plans. no change in use, bulk, occupancy or egress.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 40-story condominium built in 1998, with 133 homes, on a 7,100 sq ft lot.
- Built
- 1998
- Floors
- 40
- Residential units
- 133
- Building type
- Condominium
- Land use
- Mixed residential and commercial
- Zoning district
- C4-7
- Lot area
- 7,100 sq ft
- Building area
- 199,773 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 2, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 5 open notices on record for this building, out of 34 notices on file; the most recent was issued Jan 24, 2018.
- Fail to certify class
Issued Jan 24, 2018 — FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
- Elevator
Issued Mar 15, 2012
- Elevator annual inspection /
Issued Dec 13, 2011 — VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2010 INSPECTION/TEST
2 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 2, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01324715-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “LOC Issued.”
- Sign-off date recorded05
DOB lists a sign-off date for this filing.
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 73,707 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01324715-I1
- BBL
- 1011317501
- Postal code
- 10023 · 559 filings
- Review type
- Standard Plan Examination
- Existing stories
- 40
- Proposed stories
- 40
- Existing dwelling units
- 133
- Proposed dwelling units
- 133








