What the filing says
A public-record reading of the proposed work.
Temporary shoring for sidewalk shed as per drawings. shoring shall comply with ch #33 of the NYC bc. no change in use, occupancy or egress under this application.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 16-story elevator apartment building built in 1928, with 22 homes, on a 4,900 sq ft lot.
- Built
- 1928
- Last altered
- 1989
- Floors
- 16
- Residential units
- 22
- Building type
- Elevator apartment building
- Land use
- Elevator apartments
- Zoning district
- M1-8A/R12
- Lot area
- 4,900 sq ft
- Building area
- 69,649 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 7, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 23 open notices on record for this building, out of 69 notices on file; the most recent was issued Mar 2, 2026.
- Construction
Issued Mar 2, 2026 — FTM BLDG. OBSERVED AT EXP 2: MISSING/ DAMAGED BRICKWORK. OBSERVED AT EXP 4: BROKEN WINDOW PANE AT 13TH FLOOR & 11TH FLOOR, ERRODED MORTAR JOINTS. REMEDY: REPAIR AND/OR REPLACE DEFECTIVE BRICKWORK & WINDOWS
- Construction
Issued Sep 11, 2024 — EMERGENCY WORK ORDER DUE TO DETERIORIATED MASONRY BRICKS AT NORTH/ WEST CORNER AND MISSING STONE UNITS AT 14TH FLOOR. REMEDY: IMMEDIATELY PROVIDE ADEQUATE SAFETY MEASURES AT WEST ELEVATION, EXPOSURE #4
- Failure to correct swarmp conditions (facade)
Issued Nov 1, 2023 — FAILURE TO CORRECT SWARMP CONDITIONS
20 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 6, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M08019903-S2.
- First permit date recorded02
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated03
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 76,126 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M08019903-S2
- BBL
- 1008300046
- Postal code
- 10001 · 599 filings
- Review type
- Professional Certification
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 20
- Proposed dwelling units
- 20