NYC DOB record · B00538942-S1

20 Bayard Street

20 Bayard Street, Brooklyn, NY 11211

Alteration filing in Williamsburg, Brooklyn. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 14, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B00538942-S1

20 Bayard Street

Brooklyn, NY 11211

Alteration filing · status dated Aug 25, 2022

Current record
Approved
Proposed scale
Not stated
Dwelling units
62
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B00538942-S1 as a alteration filing at 20 Bayard Street, Brooklyn, NY 11211. Its latest published status category is Approved, dated Aug 25, 2022. The filing records 62 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Aug 25, 2022
Proposed scale
62 proposed dwelling units
The building, not the filingwhat it sold for, apartment sizes, the owner of record and every filing at BIN 3391875Applicant of recordSee the 5 filings that name Brunswick Engineering LLC
FiledSep 23, 2021
Current recordApproved
Proposed scale62 units
Recorded cost$14,000

What the filing says

A public-record reading of the proposed work.

Installation of air cooled heat pump and associated air handlers and ductwork in conjunction with the interior renovation of the apartment unit, as per plans filed herewith. No change to use, egress or occupancy.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 16-story condominium built in 2005, with 62 homes, on a 31,000 sq ft lot.

Built
2005
Floors
16
Residential units
62
Building type
Condominium
Land use
Elevator apartments
Zoning district
M1-2/R6B
Lot area
31,000 sq ft
Building area
49,432 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 21, 2026. They describe the tax lot, not this filing.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B00538942-S1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,747 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B00538942-S1
BBL
3027217503
Review type
Standard Plan Examination
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
62
Proposed dwelling units
62
mechanical