What the filing says
A public-record reading of the proposed work.
Suspended scaffolding filed in order to perform facade exterior work. facade inspections to be done. sidewalk shed to be installed under separate application.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 7-story factory or industrial building built in 1919, with 69 homes, on a 17,467 sq ft lot.
- Built
- 1919
- Floors
- 7
- Residential units
- 69
- Building type
- Factory or industrial building
- Land use
- Industrial and manufacturing
- Zoning district
- M1-2
- Lot area
- 17,467 sq ft
- Building area
- 92,856 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 8, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 32 open notices on record for this building, out of 77 notices on file; the most recent was issued May 26, 2026.
- Construction
Issued May 26, 2026 — FTM BLDG IN A CODE COMPLIANT MANNER-OBSVD AT EXP1 ON GRAND AVE,BRICK MASONRY BULGING BELOW PARAPET LINE AND ABOVE TOP FLOOR WINDOWS. OWNER TO IMMED RETAIN NYSPE TO EVAL ENTIRE BLDG,PREPARE/FILE REPAIR DWGS, REPAIR BLDG UNDER PERMIT, START OWRK BY 7/26/26. COMPLETE/SIGN OFF WORK BY 09/26/26
- Hazardous condition (facade)
Issued May 1, 2023 — CYCLE 9B UNSAFE REPORT FILED
- No report and / or late filing (facade)
Issued Feb 22, 2023 — FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023
29 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B01287465-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “LOC Issued.”
- Sign-off date recorded05
DOB lists a sign-off date for this filing.
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 74,561 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B01287465-I1
- BBL
- 3018770035
- Postal code
- 11205 · 2352 filings
- Review type
- Standard Plan Examination
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- Empty in the source
- Proposed dwelling units
- Empty in the source