What the filing says
A public-record reading of the proposed work.
Filing herewith landscape scope for paving at (inside/interior- not at the right-of-way but behind the property line- lot) the South Transverse as per plans. No change in use, occupancy, or egress under this application.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 6-story place of public assembly built in 1964, on a 58,204 sq ft lot.
- Built
- 1964
- Floors
- 6
- Residential units
- 0
- Building type
- Place of public assembly
- Land use
- Commercial and office
- Zoning district
- C4-7
- Lot area
- 58,204 sq ft
- Building area
- 260,453 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 19, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 16 open notices on record for this building, out of 45 notices on file; the most recent was issued Sep 6, 2019.
- Elevator
Issued Sep 6, 2019 — VIO ISSUED TO ELEVATOR-FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST
- Elevator
Issued Sep 6, 2019 — VIO ISSUED TO ELEVATOR-FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST
- Elevator
Issued Jan 3, 2017 — VIO ISSUED TO ELEVATOR-FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST
13 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 19, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01444849-S2.
- Current status updated02
The latest recorded filing status is “Plan Examiner Review.”
For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 65,533 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01444849-S2
- BBL
- 1011340005
- Postal code
- 10023 · 394 filings
- Review type
- Standard Plan Examination
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 0
- Proposed dwelling units
- 0








