What the filing says
A public-record reading of the proposed work.
General construction work is proposed in the existing unit #5S on the 5th and 6th floors. A subsequent plumbing application will be filed. All work is per the submitted plans. There will be no changes to use, egress, or occupancy under this application.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 19-story condominium built in 2007, with 15 homes, on a 7,407 sq ft lot.
- Built
- 2007
- Floors
- 19
- Residential units
- 15
- Building type
- Condominium
- Land use
- Elevator apartments
- Zoning district
- C6-3
- Lot area
- 7,407 sq ft
- Building area
- 42,413 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 15, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
No open violations are recorded for this building. 25 notices are on file, all with a recorded resolution.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 2, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01204203-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “LOC Issued.”
- Sign-off date recorded05
DOB lists a sign-off date for this filing.
For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 63,690 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01204203-I1
- BBL
- 1006957506
- Postal code
- 10011 · 393 filings
- Review type
- Standard Plan Examination
- Existing stories
- 19
- Proposed stories
- 19
- Existing dwelling units
- 15
- Proposed dwelling units
- 15