What the filing says
A public-record reading of the proposed work.
Minor plumbing work for a combination of Apts #10K & #10L. Removal of one of the kitchens and some bath plumbing work. No change in egress use or occupancy.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 20-story elevator apartment building built in 1930, with 194 homes, on a 10,350 sq ft lot.
- Built
- 1930
- Last altered
- 1987
- Floors
- 20
- Residential units
- 194
- Building type
- Elevator apartment building
- Land use
- Elevator apartments
- Zoning district
- C1-9A
- Lot area
- 10,350 sq ft
- Building area
- 151,832 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 29, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 5 open notices on record for this building, out of 49 notices on file; the most recent was issued Nov 1, 2023.
- Failure to correct swarmp conditions (facade)
Issued Nov 1, 2023 — FAILURE TO CORRECT SWARMP CONDITIONS
- Hazardous condition (facade)
Issued Feb 21, 2023 — CYCLE 9B UNSAFE REPORT FILED
- Facade safety program
Issued Feb 13, 2018
2 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 29, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01348015-S1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 73,707 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01348015-S1
- BBL
- 1008970035
- Postal code
- 10003 · 619 filings
- Review type
- Professional Certification
- Existing stories
- 19
- Proposed stories
- 19
- Existing dwelling units
- 194
- Proposed dwelling units
- 194








