What the filing says
A public-record reading of the proposed work.
Suspended scaffold outrigger system for exterior facade restoration work and facade inspection at 200 east 64 street, manhattan, ny 10065
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 30-story elevator apartment building built in 1968, with 112 homes, on a 13,054 sq ft lot.
- Built
- 1968
- Last altered
- 1988
- Floors
- 30
- Residential units
- 112
- Building type
- Elevator apartment building
- Land use
- Mixed residential and commercial
- Zoning district
- C1-9
- Lot area
- 13,054 sq ft
- Building area
- 215,465 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 18, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 7 open notices on record for this building, out of 115 notices on file; the most recent was issued Mar 21, 2025.
- Construction
Issued Mar 21, 2025 — EWO PARKIG STRUCT CONSIST OF 3 LVL OBSERVED DAMAGE BEAM ON LVL 2 CAUSI NG IMMEDIATE HAZARD TO VEHICULAR/PEDESTRIAN TRAFFIC REQUIRING SAFETY MEASURE TO BE IMPLEMENTED.REMEDY:OWNER TO RETAIN A NYS RDP TO DIRECT & SUPERVISE THE IMMEDIATE INSTALLATION OF SAFETY MEAS ON LVL 2 CELLAR & IMPLEMENT CLEAR DELINATION & SAFE GUARDING NAVIGATION OF DRIVERS/PEDES
- Failure to correct swarmp conditions (facade)
Issued Nov 1, 2023 — FAILURE TO CORRECT SWARMP CONDITIONS
- Fail to certify class
Issued Oct 4, 2023 — FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
4 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 18, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01414832-P1.
- Application approved02
The application reached an approved status in the DOB record.
- Current status updated03
The latest recorded filing status is “Approved.”
For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 64,552 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01414832-P1
- BBL
- 1014180045
- Postal code
- 10065 · 326 filings
- Review type
- Standard Plan Examination
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- Empty in the source
- Proposed dwelling units
- Empty in the source