NYC DOB record · M01457103-I1

200 East 75 Street

200 East 75 Street, Manhattan, NY 10021

Alteration filing in Upper East Side-Lenox Hill-Roosevelt Island, Manhattan. The latest DOB status is approved.

A plan examiner has approved the application. A permit still has to be issued before work can begin. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Oct 7, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M01457103-I1

200 East 75 Street

Manhattan, NY 10021

Alteration filing · status dated Oct 5, 2026

Current record
Approved
Proposed scale
Not stated
Dwelling units
35
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M01457103-I1 as a alteration filing at 200 East 75 Street, Manhattan, NY 10021. Its latest published status category is Approved, dated Oct 5, 2026. The filing records 35 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Oct 5, 2026
Proposed scale
35 proposed dwelling units
Applicant of recordSee the 202 filings that name Murdoch Engineering
FiledOct 5, 2026
Current recordApproved
Proposed scale35 units
Recorded cost$5,265

What the filing says

A public-record reading of the proposed work.

Erect illuminated accessory business wall sign for jo malone on w. 75th st elevation.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

Violation record

Are there open violations here?

The Department of Buildings has 1 open notice on record for this building, out of 79 notices on file; the most recent was issued Jan 13, 1997.

  • Local law 10/81 -

    Issued Jan 13, 1997

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 7, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M01457103-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. Current status updated

    The latest recorded filing status is “Approved.”

    03

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 76,126 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M01457103-I1
BIN
1091731
BBL
1014290045
Review type
Professional Certification
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
35
Proposed dwelling units
35