NYC DOB record · B00286229-I1

2017 West 10 Street

2017 West 10 Street, Brooklyn, NY 11223

Alteration filing in Gravesend (West), Brooklyn. The latest DOB status is loc issued.

DOB has issued a Letter of Completion, which records that the work in this filing is finished. What every status means

Recorded as completedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 12, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B00286229-I1

2017 West 10 Street

Brooklyn, NY 11223

Alteration filing · status dated Dec 27, 2020

Current record
Recorded as completed
Proposed scale
Not stated
Dwelling units
3
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B00286229-I1 as a alteration filing at 2017 West 10 Street, Brooklyn, NY 11223. Its latest published status category is Recorded as completed, dated Dec 27, 2020. The filing records 3 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Recorded as completed
Latest status date
Dec 27, 2020
Proposed scale
3 proposed dwelling units
Complete building dossierView all 2 filings associated with BIN 3190990Applicant of recordSee the 36 filings that name Milee Building Consulting LLC
FiledJan 28, 2020
Current recordRecorded as completed
Proposed scale3 units
Recorded cost$7,200

What the filing says

A public-record reading of the proposed work.

Remove one existing boiler & h.w.h. and install three new boilers and three new h.w.h. at existing boiler room as per plan filed here with. no change in use, egress or certificate of occupancy.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 2-story walk-up apartment building built in 1932, with 3 homes, on a 2,000 sq ft lot.

Built
1932
Floors
2
Residential units
3
Building type
Walk-up apartment building
Land use
Walk-up apartments
Zoning district
R4-1
Lot area
2,000 sq ft
Building area
1,920 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 14, 2026. They describe the tax lot, not this filing.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B00286229-I1.

    01
  2. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    02
  3. Sign-off date recorded

    DOB lists a sign-off date for this filing.

    03
  4. Current status updated

    The latest recorded filing status is “LOC Issued.”

    04

For scale: half of DOB filings are permitted within 18 days of being filed and a quarter take longer than 4 months, measured across 50,115 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B00286229-I1
BBL
3070960076
Review type
Professional Certification
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
3
Proposed dwelling units
3