NYC DOB record · M01461792-S2

203 West 22 Street

203 West 22 Street, Manhattan, NY 10011

Alteration filing in Chelsea-Hudson Yards, Manhattan. The latest DOB status is prof cert qa review.

The filing was professionally certified by its architect or engineer, and DOB is auditing it rather than reviewing it in full. What every status means

Under reviewAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Nov 18, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M01461792-S2

203 West 22 Street

Manhattan, NY 10011

Alteration filing · status dated Nov 16, 2026

Current record
Under review
Proposed scale
4 stories
Dwelling units
4
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M01461792-S2 as a alteration filing at 203 West 22 Street, Manhattan, NY 10011. Its latest published status category is Under review, dated Nov 16, 2026. The filing records 4 proposed stories and 4 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Under review
Latest status date
Nov 16, 2026
Proposed scale
4 proposed stories and 4 proposed dwelling units
The building, not the filingopen housing violations, what it sold for, the owner of record and every filing at BIN 1014125Applicant of recordSee the 30 filings that name Savoy York Consulting INC.
FiledNov 13, 2026
Current recordUnder review
Proposed scale4 stories
Recorded cost$85,020

What the filing says

A public-record reading of the proposed work.

Replacement of water damaged interior gypsum board and finished at all floors. No change in egress or occupancy.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 4-story walk-up apartment building built in 1901, with 4 homes, on a 822 sq ft lot.

Built
1901
Last altered
2017
Floors
4
Residential units
4
Building type
Walk-up apartment building
Land use
Walk-up apartments
Zoning district
R8A
Lot area
822 sq ft
Building area
2,548 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Nov 18, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 4 open notices on record for this building, out of 4 notices on file; the most recent was issued Apr 13, 2026.

  • Construction

    Issued Apr 13, 2026 — FTM BLDG IN A SAFE CONDITION.DUE TO FIRE @ 210 7TH AVE ON/AROUND 4/12, THE 203 W 22ND ST BLDG WAS DAMAGED W/210 CHIMNEY PARTIALLY COLLAPSED ONTO ROOF W/CRACKED ROOF JOIST,SAGGING ROOF.OWNER TO RETAIN NYSPE TO EVAL ENTIRE BLDG,FILE REPAIR JOB W/DOB,BLDG TO BE PERM REPAIRED UNDER PERMIT, START 5/25/26

  • Construction

    Issued Apr 13, 2026 — EMERGENCY WORK ORDER.DUE TOFIRE@210 7AVE,ON/AROUND 4/12/26,203 WEST W22ST WAS DMGD W/CRCKD SAGGNG ROOF DUE TO 200 7AVE'S CHIMNEY THAT PRTLLY CLLPSD ONTO ROOF.ROOF DRAIN CLOGGED W/POOLED WATR APPROX UP TO OWNR TO IMMED RTAIN NYSPE&DOB REG CG TO 1.IMMED SHORNG ROOF,AS REQ,2 DRAIN ROOF&CLEAN OFF CLLPSD DEBRIS,3.ALL WRK TO BE UNDR FULLTIME NYS

  • Construction

    Issued Apr 12, 2026 — STRUCTURE RENDERED NON COMPLAINT. AT TIME OF INSPECTION OBSERVED WATER DAMAGE THROUGHOUT, AT APARTMENT#4 AND 3 CEILING AND WALL DAMAGED, WINDOWS OUT, ROOF JOIST SNAPPED AND CHIMNEY FROM ADJACENT BUILDING FELL ON ROOF DUE TO FIRE AT 210 7 AVENUE MANHATTAN. VACATE ENTIRE BUILDING.

  • 1 further open notice is on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Nov 18, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M01461792-S2.

    01
  2. Current status updated

    The latest recorded filing status is “Prof Cert QA Review.”

    02

For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 97,160 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M01461792-S2
BBL
1007720043
Review type
Professional Certification
Existing stories
4
Proposed stories
4
Existing dwelling units
4
Proposed dwelling units
4
General construction