NYC DOB record · M08032552-I1

2033 5 Avenue

2033 5 Avenue, Manhattan, NY 10035

Alteration filing in East Harlem (North), Manhattan. The latest DOB status is approved.

A plan examiner has approved the application. A permit still has to be issued before work can begin. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Oct 31, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M08032552-I1

2033 5 Avenue

Manhattan, NY 10035

Alteration filing · status dated Oct 28, 2026

Current record
Approved
Proposed scale
22 stories
Dwelling units
222
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M08032552-I1 as a alteration filing at 2033 5 Avenue, Manhattan, NY 10035. Its latest published status category is Approved, dated Oct 28, 2026. The filing records 22 proposed stories and 222 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Oct 28, 2026
Proposed scale
22 proposed stories and 222 proposed dwelling units
Applicant of recordSee the 62 filings that name Wsp USA Buildings INC.
FiledOct 23, 2026
Current recordApproved
Proposed scale22 stories
Recorded cost$200,000

What the filing says

A public-record reading of the proposed work.

Structural construction scope for tenant fit out of A-1 assembly spaces at the cellar, first thru 4th floors. No change to use, egress or occupancy.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

Violation record

Are there open violations here?

No open violations are recorded for this building. 19 notices are on file, all with a recorded resolution.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 30, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M08032552-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. Current status updated

    The latest recorded filing status is “Approved.”

    03

For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 91,066 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M08032552-I1
BIN
1091803
BBL
1017500001
Review type
Standard Plan Examination
Existing stories
22
Proposed stories
22
Existing dwelling units
222
Proposed dwelling units
222
Structural work