NYC DOB record · B00325089-P1

2049 Pitkin Avenue

2049 Pitkin Avenue, Brooklyn, NY 11207

Alteration filing in East New York (North), Brooklyn. The latest DOB status is approved.

A plan examiner has approved the application. A permit still has to be issued before work can begin. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 12, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B00325089-P1

2049 Pitkin Avenue

Brooklyn, NY 11207

Alteration filing · status dated Jun 29, 2021

Current record
Approved
Proposed scale
Source review
Dwelling units
Source review
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B00325089-P1 as a alteration filing at 2049 Pitkin Avenue, Brooklyn, NY 11207. Its latest published status category is Approved, dated Jun 29, 2021. The source includes a scale value that is withheld pending data-quality review.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Jun 29, 2021
Proposed scale
Source value under review
Complete building dossierView all 5 filings associated with BIN 3391573Applicant of recordSee the 158 filings that name Gregory V. Perotto, P.E.
FiledJun 29, 2021
Current recordApproved
Proposed scaleSource value under review
Recorded cost$16,000

What the filing says

A public-record reading of the proposed work.

Gas connections for direct replacement of sixteen (16) split HVAC systems.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 4-story warehouse built in 2006, on a 25,000 sq ft lot.

Built
2006
Floors
4
Residential units
0
Building type
Warehouse
Land use
Industrial and manufacturing
Zoning district
M3-2
Lot area
25,000 sq ft
Building area
63,000 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 14, 2026. They describe the tax lot, not this filing.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B00325089-P1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. Current status updated

    The latest recorded filing status is “Approved.”

    03

For scale: half of DOB filings are permitted within 18 days of being filed and a quarter take longer than 4 months, measured across 50,115 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B00325089-P1
BBL
3037190001
Review type
Professional Certification
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
Source value under review
Proposed dwelling units
Source value under review