NYC DOB record · B00608440-P1

205 Bay 8 Street

205 Bay 8 Street, Brooklyn, NY 11228

Alteration filing in Bath Beach, Brooklyn. The latest DOB status is approved.

A plan examiner has approved the application. A permit still has to be issued before work can begin. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 14, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B00608440-P1

205 Bay 8 Street

Brooklyn, NY 11228

Alteration filing · status dated Dec 22, 2021

Current record
Approved
Proposed scale
3 stories
Dwelling units
3
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B00608440-P1 as a alteration filing at 205 Bay 8 Street, Brooklyn, NY 11228. Its latest published status category is Approved, dated Dec 22, 2021. The filing records 3 proposed stories and 3 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Dec 22, 2021
Proposed scale
3 proposed stories and 3 proposed dwelling units
The building, not the filingEvery filing at BIN 3394262, with the parcel and violation recordApplicant of recordSee the 478 filings that name Cl Engineering P.C.
FiledDec 13, 2021
Current recordApproved
Proposed scale3 stories
Recorded cost$8,000

What the filing says

A public-record reading of the proposed work.

Plumbing work at basemen and cellar of existing 3 story building with general construction work as per plans filed here with. also file to address violation 35409805z. no change in use, egress or c of o.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 3-story condominium built in 2007, with 6 homes, on a 5,800 sq ft lot.

Built
2007
Floors
3
Residential units
6
Building type
Condominium
Land use
Walk-up apartments
Zoning district
R4
Lot area
5,800 sq ft
Building area
8,940 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 21, 2026. They describe the tax lot, not this filing.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B00608440-P1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. Current status updated

    The latest recorded filing status is “Approved.”

    03

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 70,325 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B00608440-P1
BBL
3064267501
Review type
Standard Plan Examination
Existing stories
3
Proposed stories
3
Existing dwelling units
3
Proposed dwelling units
3
plumbing