What the filing says
A public-record reading of the proposed work.
Installation of temporary pipe scaffold as per plans. pipe scaffold shall comply with chapter 33 of the 2014 NYC building code. no change in use, egress or occupancy under this application.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 8-story elevator apartment building built in 1950, with 1610 homes, on a 1,410,820 sq ft lot.
- Built
- 1950
- Last altered
- 2023
- Floors
- 8
- Residential units
- 1610
- Building type
- Elevator apartment building
- Land use
- Elevator apartments
- Zoning district
- R5
- Lot area
- 1,410,820 sq ft
- Building area
- 1,526,800 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 13, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 1 open notice on record for this building, out of 9 notices on file; the most recent was issued Jan 12, 2022.
- Hazardous condition (facade)
Issued Jan 12, 2022 — NYCHA CYCLE 9A UNSAFE REPORT FILED
A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B00033941-I1.
- First permit date recorded02
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Sign-off date recorded03
DOB lists a sign-off date for this filing.
- Current status updated04
The latest recorded filing status is “LOC Issued.”
For scale: half of DOB filings are permitted within 18 days of being filed and a quarter take longer than 4 months, measured across 50,115 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B00033941-I1
- BBL
- 3083290225
- Postal code
- 11236 · 753 filings
- Review type
- Professional Certification
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- Empty in the source
- Proposed dwelling units
- Empty in the source








