What the filing says
A public-record reading of the proposed work.
Filing for the replacement of gas boilers. no change to use, occupancy or egress
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 18-story condominium built in 1989, with 43 homes, on a 5,033 sq ft lot.
- Built
- 1989
- Last altered
- 2006
- Floors
- 18
- Residential units
- 43
- Building type
- Condominium
- Land use
- Elevator apartments
- Zoning district
- R8
- Lot area
- 5,033 sq ft
- Building area
- 33,969 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 1, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 7 open notices on record for this building, out of 34 notices on file; the most recent was issued Nov 1, 2023.
- Failure to correct swarmp conditions (facade)
Issued Nov 1, 2023 — FAILURE TO CORRECT SWARMP CONDITIONS
- Hazardous condition (facade)
Issued Feb 21, 2023 — CYCLE 9B UNSAFE REPORT FILED
- Construction
Issued Aug 26, 2021 — BOROUGH COMMISSIONER STOP WORK ORDER APPLICATION #140749153 DUE TO CONTACTOR WITHDRAWAL. CONSTRUCTION WORK ON THE FACADE HAS NOT STARTED, 0% OF WORK COMPLETED.
4 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01433470-S1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,798 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01433470-S1
- BBL
- 1015407501
- Postal code
- 10128 · 250 filings
- Review type
- Professional Certification
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 43
- Proposed dwelling units
- 43