What the filing says
A public-record reading of the proposed work.
Herewith filing for interior renovation with horizontal enlargement to existing (2) two story with cellar, (1) one family building. no change in use, egress or occupancy.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 2-story one-family home built in 1925, on a 2,600 sq ft lot.
- Built
- 1925
- Floors
- 2
- Residential units
- 1
- Building type
- One-family home
- Land use
- One and two family homes
- Zoning district
- R3-1
- Lot area
- 2,600 sq ft
- Building area
- 1,480 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Nov 4, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 2 open notices on record for this building, out of 2 notices on file; the most recent was issued Aug 5, 2026.
- Immediate
Issued Aug 5, 2026 — INSTALL APPROXIMATELY 172 LINEAR FEET OF CONSTRUCTION FENCE
- Construction
Issued Aug 4, 2026 — ATOI OBSERVED WORK HAS CONTINUED WHILE ON NOTICE OF SWO ISSUED ON 07/30/2026 COMPLAINT# 3A73024. THERE ARE NO ACTIVE PERMITS TO VERIFY ANY OF THE QUESTIONABLE CONSTRUCTION WORK THAT IS UNDOCUMENTED AND UNPERMITTED. THIS POSES A UNSAFE CONDITION TO PUBLIC AND PROPERTY.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Nov 4, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B01477359-I1.
- Current status updated02
The latest recorded filing status is “Plan Examiner Review.”
For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 91,085 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B01477359-I1
- BIN
- 3191693
- BBL
- 3071050050
- Postal code
- 11223 · 1951 filings
- Review type
- Standard Plan Examination
- Existing stories
- 2
- Proposed stories
- 2
- Existing dwelling units
- 1
- Proposed dwelling units
- 1