What the filing says
A public-record reading of the proposed work.
Installation of temporary overhead protection as per plans. no change in use, egress or occupancy.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 1-story educational building built in 1931, on a 6,000 sq ft lot.
- Built
- 1931
- Last altered
- 1994
- Floors
- 1
- Residential units
- 0
- Building type
- Educational building
- Land use
- Public facilities and institutions
- Zoning district
- R5
- Lot area
- 6,000 sq ft
- Building area
- 6,449 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 26, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 3 open notices on record for this building, out of 7 notices on file; the most recent was issued Oct 30, 2024.
- Fail to certify class
Issued Oct 30, 2024 — FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
- Construction
Issued Jan 13, 2021 — COMMISSIONER S ORDER FOR CORRECTIVE ACTION: PROVIDE FIRE GUARDS AT SECONDARY EGRESS FOR 1ST FL SYNAGOGUE / CLASSROOM SPACE REMOVED DURING CONSTRUCTION; FIRE PROTECTION SYSTEMS RENDERED INOPERABLE DURING UNPERMITTED WORK.
- Construction
Issued Nov 7, 1994
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 26, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B01307842-I1.
- First permit date recorded02
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated03
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 87,253 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B01307842-I1
- BBL
- 3071110033
- Postal code
- 11223 · 1915 filings
- Review type
- Professional Certification
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 0
- Proposed dwelling units
- 0








