What the filing says
A public-record reading of the proposed work.
Installation of pylwood fence and enclosure system as per plans. plywood fence shall comply with chapter #33 of the 2022 code no change in use, egress or occupancy under this application.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 7-story office building built in 1930, on a 3,075 sq ft lot.
- Built
- 1930
- Floors
- 7
- Residential units
- 0
- Building type
- Office building
- Land use
- Commercial and office
- Zoning district
- C4-6A
- Lot area
- 3,075 sq ft
- Building area
- 20,790 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 28, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 9 open notices on record for this building, out of 82 notices on file; the most recent was issued Feb 21, 2024.
- Hazardous condition (facade)
Issued Feb 21, 2024 — CYCLE 9C UNSAFE REPORT FILED
- Failure to correct swarmp conditions (facade)
Issued Feb 21, 2021 — CYCLE 8C FAILURE TO CORRECT SWARMP CONDITIONS
- Hazardous condition (facade)
Issued Feb 21, 2020
6 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 28, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01297368-S1.
- First permit date recorded02
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated03
The latest recorded filing status is “LOC Issued.”
- Sign-off date recorded04
DOB lists a sign-off date for this filing.
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 71,094 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01297368-S1
- BIN
- 1030419
- BBL
- 1011630032
- Postal code
- 10023 · 476 filings
- Review type
- Professional Certification
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 0
- Proposed dwelling units
- 0








