NYC DOB record · M01156666-I1

207 Avenue B

207 Avenue B, Manhattan, NY 10009

Alteration filing in East Village, Manhattan. The latest DOB status is approved.

A plan examiner has approved the application. A permit still has to be issued before work can begin. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Aug 29, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M01156666-I1

207 Avenue B

Manhattan, NY 10009

Alteration filing · status dated Aug 25, 2026

Current record
Approved
Proposed scale
4 stories
Dwelling units
6
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M01156666-I1 as a alteration filing at 207 Avenue B, Manhattan, NY 10009. Its latest published status category is Approved, dated Aug 25, 2026. The filing records 4 proposed stories and 6 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Aug 25, 2026
Proposed scale
4 proposed stories and 6 proposed dwelling units
The building, not the filingopen housing violations, the owner of record and every filing at BIN 1076878
FiledMar 7, 2025
Current recordApproved
Proposed scale4 stories
Recorded cost$130,850

What the filing says

A public-record reading of the proposed work.

Structural repairs throughout the building as per plans provided. repairs includes replacing rear exterior wall andother normal deterioration, replace damaged girders at the cellar and damaged floor beams at floors 001 through 004.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 4-story walk-up apartment building built in 1900, with 20 homes, on a 2,232 sq ft lot.

Built
1900
Last altered
1988
Floors
4
Residential units
20
Building type
Walk-up apartment building
Land use
Mixed residential and commercial
Zoning district
R7A
Lot area
2,232 sq ft
Building area
6,432 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 17, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 37 open notices on record for this building, out of 43 notices on file; the most recent was issued Nov 14, 2025.

  • Low pressure boiler

    Issued Nov 14, 2025 — VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION

  • Construction

    Issued Aug 8, 2025 — STUCT PEER REVIEW:EXP2 WALL ADJ NY NYC PARKS PROP HAS OUTER WYTHE REMOVED&INADEQUATELY REPLACED.VARIOUS STRUCT DEFECTS THROUGHOUT IN&EXT NOTED IN FEU VIOLATIONS.IMMED COMPLY W/COMMISSIONER'S ORDER #342064, VIOLATION 042425FEU10301FF DATED APRIL 24, 2025

  • Construction

    Issued Apr 24, 2025 — STRUCT PEER REVIEW:EXP2 WALL ADJ NY NYC PARKS PROP HAD OUTER WYTHE REMOVED&INADEQUATELY REPLACED.VARIOUS STRUCT DEFECTS THROUGHOUT INT& EXT NOTED IN FEU VIOLATIONS.ONWER TO PROVIDE NAMES OF(3)REPUTABLE NYSPE'S W/KNOWLEDGE &EXPERIENCE REPAIRING SIMILAR STRUCT BY MAY 9 2025

  • 34 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 16, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M01156666-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. Current status updated

    The latest recorded filing status is “Approved.”

    03

For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,798 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M01156666-I1
BBL
1003950007
Review type
Standard Plan Examination
Existing stories
4
Proposed stories
4
Existing dwelling units
6
Proposed dwelling units
6
General constructionStructural work