NYC DOB record · B00528189-I1

207 North 8 Street

207 North 8 Street, Brooklyn, NY 11211

New building filing in Williamsburg, Brooklyn. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedNew building

NYC Department of Buildings · w9ak-ipjd · accessed Sep 21, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B00528189-I1

207 North 8 Street

Brooklyn, NY 11211

New building · status dated Aug 24, 2026

Current record
Approved
Proposed scale
6 stories
Dwelling units
4
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B00528189-I1 as a new building at 207 North 8 Street, Brooklyn, NY 11211. Its latest published status category is Approved, dated Aug 24, 2026. The filing records 6 proposed stories and 4 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
New building
Latest status
Approved
Latest status date
Aug 24, 2026
Proposed scale
6 proposed stories and 4 proposed dwelling units
The building, not the filingEvery filing at BIN 3414035, with the parcel and violation recordApplicant of recordSee the 25 filings that name Pinner Architecture PLLC
FiledJun 18, 2021
Current recordApproved
Proposed scale6 stories
Recorded cost$410,220

What the filing says

A public-record reading of the proposed work.

New 6 story + cellar, 4 dwellings new building

Street Futures classifies this record as a new building based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

Violation record

Are there open violations here?

No open violations are recorded for this building. 1 notice is on file, all with a recorded resolution.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 21, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B00528189-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,747 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B00528189-I1
BBL
3023130027
Review type
Standard Plan Examination
Existing stories
Empty in the source
Proposed stories
6
Existing dwelling units
Empty in the source
Proposed dwelling units
4
General construction