2078 Morris Avenue

2078 Morris Avenue, Bronx, NY 10453

Alteration filing in Mount Hope, Bronx. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 10, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · X01095826-I1

2078 Morris Avenue

Bronx, NY 10453

Alteration filing · status dated Sep 8, 2026

Current record
Approved
Proposed scale
Not stated
Dwelling units
72
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing X01095826-I1 as a alteration filing at 2078 Morris Avenue, Bronx, NY 10453. Its latest published status category is Approved, dated Sep 8, 2026. The filing records 72 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Sep 8, 2026
Proposed scale
72 proposed dwelling units
Applicant of recordSee the 402 filings that name New York Engineering ASSOC., P.C.
FiledAug 23, 2024
Current recordApproved
Proposed scale72 units
Recorded cost$20,000

What the filing says

A public-record reading of the proposed work.

Install new gas service, meter, piping and gas booster.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 5-story walk-up apartment building built in 1926, with 72 homes, on a 19,250 sq ft lot.

Built
1926
Last altered
2001
Floors
5
Residential units
72
Building type
Walk-up apartment building
Land use
Walk-up apartments
Zoning district
R8
Lot area
19,250 sq ft
Building area
59,400 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 10, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 7 open notices on record for this building, out of 12 notices on file; the most recent was issued Mar 13, 2026.

  • Construction

    Issued Mar 13, 2026 — FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. RETAINING WALL ALONG EXP3 E EXHIBITS DEFECTIVE CONDITIONS. REMEDY: OWNER TO HIRE NYS-PE TO PREPARE ENGINEERING REPORT AND SUBMIT REPORT TO FACADES@BUILDINGS.NYC.GOV

  • Construction

    Issued Feb 18, 2026 — FTM BLDG R/W-@ EXP3 OF THE BLDG THE RUBBLE STONE R/W SHARED W/2075 CRESTON AVE & 2083 CRESTON AVE IS IN A STATE OF DISREPAIR W/DISJOINTED /MISSING STONE,DETERIORATED MORTAR JOINTS @ TOP FACE OF R/W. OWNER TO RETAIN NYSPE TO EVAL ENTIR R/W & FILE REPAIR DWGS W/DOB,R/W TO BE PERM REPAIRED UNDER PERMIT, START WORK BY 4/6/26

  • Construction

    Issued Feb 14, 2026 — FTM BLDG IN CODE COMPLIANT MANNER. OBSERVED RETAINING WALL ALONG EXP3E EXHIBITS DEFECTIVE CONDITINS INCLUDED (BULGED/DISPLACED STONES OF WALL STRUCTURE CRACKING & LOOSE STONES. REMEDY:OWNER HIRE NYS-PE:PREPARE AN ENGINEERING REPORT ADDRESSING CONDITIONS. OWNER SUBMIT ENGINEER REPORT FACADES@BUILDINGS.NYC.GOV NO LATER THAN 3/3/2026

  • 4 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing X01095826-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 76,126 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
X01095826-I1
BIN
2013840
BBL
2031690009
Review type
Professional Certification
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
72
Proposed dwelling units
72
plumbing