NYC DOB record · X01467997-I1

2080 Grand Concourse

2080 Grand Concourse, Bronx, NY 10457

Alteration filing in Mount Hope, Bronx. The latest DOB status is approved.

A plan examiner has approved the application. A permit still has to be issued before work can begin. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Oct 31, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · X01467997-I1

2080 Grand Concourse

Bronx, NY 10457

Alteration filing · status dated Oct 29, 2026

Current record
Approved
Proposed scale
Not stated
Dwelling units
Not stated
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing X01467997-I1 as a alteration filing at 2080 Grand Concourse, Bronx, NY 10457. Its latest published status category is Approved, dated Oct 29, 2026. The published record does not state proposed stories or dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Oct 29, 2026
Proposed scale
Not stated in this filing
The building, not the filingopen housing violations, the owner of record and every filing at BIN 2013680Applicant of recordSee the 178 filings that name Nkm Engineering PLLC
FiledOct 12, 2026
Current recordApproved
Proposed scaleNot specified
Recorded cost$233,410

What the filing says

A public-record reading of the proposed work.

Installation of a 56.71kW, Grid-Tied, Roof-Mounted Photovoltaic System at 2080 Grand Concourse, Bronx NY 10457

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 5-story walk-up apartment building built in 1920, with 53 homes, on a 11,304 sq ft lot.

Built
1920
Floors
5
Residential units
53
Building type
Walk-up apartment building
Land use
Walk-up apartments
Zoning district
R8
Lot area
11,304 sq ft
Building area
43,460 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 31, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 4 open notices on record for this building, out of 13 notices on file; the most recent was issued Oct 31, 2025.

  • Construction

    Issued Oct 31, 2025 — FTC W/COMMISSIONER'S ORDER CONTROL#348182 VIO#090825PI20502TC DATED 09/08/2025 REQUIRING OWNER TO START BLDG REPAIRS UNDER PERMIT. AS OF TODAY 10/31/25 THERE ARE NO JOBS FILED IN BIS OR DOBNOW TO REPAIR BLDG IMMED COMPLY W/COMMISSIONER'S ORDER CONTROL#348192 VIO#090825PI20502TC TO REPAIR BLDG UNDER PERMIT

  • Construction

    Issued Sep 8, 2025 — FTM BLDG IN A CODE COMPLIANT MANNER-OBSVD BUILTUP MATERIAL ON TOP OF CORNICE @ EXP1 COURTYARD. OBSVD CRACKED MORTAR @ EXP1 COURTYARD MEAR 5TH STORY WINDOW OBSVD CRACKED BRICKS @ EXP1 GROUND LEVEL. OWNER TO IMMED RETAIN NYSPE TO EVAL THE ENIRE BLDG DETERMINE STRUCT STAB & PREPARE/FILE DWGS REPAIR BUILDING UNDER PERMIT START WORK BY 10/8/25

  • Failure to post energy

    Issued Apr 29, 2021 — FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3

  • 1 further open notice is on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 31, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing X01467997-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. Current status updated

    The latest recorded filing status is “Approved.”

    03

For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 90,393 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
X01467997-I1
BBL
2031560096
Review type
Standard Plan Examination
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
Empty in the source
Proposed dwelling units
Empty in the source
Solar work