What the filing says
A public-record reading of the proposed work.
Installation of construction fence to protect site, during HPD & DOB AED demolition
Street Futures classifies this record as a full demolition based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 2-story mainly residential with some commercial built in 1901, on a 2,386 sq ft lot.
- Built
- 1901
- Floors
- 2
- Residential units
- 1
- Building type
- Mainly residential with some commercial
- Land use
- Mixed residential and commercial
- Zoning district
- R8
- Lot area
- 2,386 sq ft
- Building area
- 1,854 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Nov 18, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 2 open notices on record for this building, out of 3 notices on file; the most recent was issued Feb 12, 2025.
- Construction
Issued Feb 12, 2025 — STRUCTURE RENDERED NON COMPLIANT DUE TO FIRE AT 2086 ANTHONY AVENUE. BUILDING HAS SUSTAINED SUBSTANTIAL FIRE, SMOKE AND WATER DAMAGE THROUGHOUT. WINDOWS AND DOORS ARE OUT, WALLS AND CEILINGS HEAVILY DAMAGED, CHARRED JOISTS WITH ROOF OPEN TO ELEMENTS. VACATE ENTIRE BUILDING.
- Immediate
Issued Feb 12, 2025 — ERECT A TOTAL OF APPX 145 LINEAR FT OF TIGHT BOARD CONSTRUCTION FENCE AS FOLLOWS EXP#1 (ANTHONY AVE) 25 FT TO MEET ADJACENT PROPERTY FENCE (2086 ANTHONY AVE) EXP #3 25 FT EXP 4 95 FT TO SAFE GUARD THE PUBLIC AND PROPERTY
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Nov 18, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing X01450635-S1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 97,160 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- X01450635-S1
- BBL
- 2031560131
- Postal code
- 10457 · 568 filings
- Review type
- Professional Certification
- Existing stories
- 2
- Proposed stories
- Empty in the source
- Existing dwelling units
- 1
- Proposed dwelling units
- Empty in the source