NYC DOB record · B00521753-I1

209 Clinton Avenue

209 Clinton Avenue, Brooklyn, NY 11205

Alteration filing in Clinton Hill, Brooklyn. The latest DOB status is loc issued.

DOB has issued a Letter of Completion, which records that the work in this filing is finished. What every status means

Recorded as completedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 14, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B00521753-I1

209 Clinton Avenue

Brooklyn, NY 11205

Alteration filing · status dated May 6, 2024

Current record
Recorded as completed
Proposed scale
13 stories
Dwelling units
104
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B00521753-I1 as a alteration filing at 209 Clinton Avenue, Brooklyn, NY 11205. Its latest published status category is Recorded as completed, dated May 6, 2024. The filing records 13 proposed stories and 104 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Recorded as completed
Latest status date
May 6, 2024
Proposed scale
13 proposed stories and 104 proposed dwelling units
The building, not the filingopen housing violations, what it sold for, the owner of record and every filing at BIN 3322382Applicant of recordSee the 20 filings that name Howard L Zimmerman Arch & Eng PC
FiledJun 22, 2021
Current recordRecorded as completed
Proposed scale13 stories
Recorded cost$67,396

What the filing says

A public-record reading of the proposed work.

Bulkhead & fisp repairs. no change in use, egress or occupancy.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 14-story elevator apartment building built in 1944, with 520 homes, on a 82,350 sq ft lot.

Built
1944
Last altered
2012
Floors
14
Residential units
520
Building type
Elevator apartment building
Land use
Elevator apartments
Zoning district
R6
Lot area
82,350 sq ft
Building area
651,914 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 17, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 3 open notices on record for this building, out of 35 notices on file; the most recent was issued Apr 6, 2018.

  • Low pressure boiler

    Issued Apr 6, 2018 — VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT

  • (other bldgs types) - elevator affirmation of

    Issued May 30, 2014 — VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2012 CAT 1 INSP/TST

  • Low pressure boiler

    Issued Dec 13, 2011 — VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 16, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B00521753-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “LOC Issued.”

    04
  5. Sign-off date recorded

    DOB lists a sign-off date for this filing.

    05

For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,747 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B00521753-I1
BBL
3019020001
Review type
Standard Plan Examination
Existing stories
13
Proposed stories
13
Existing dwelling units
104
Proposed dwelling units
104
General construction