What the filing says
A public-record reading of the proposed work.
Modification to existing VERIZON telecommunications site. Install 1 new antenna sector (3 antennas and 3 RRH units), relocate 1 existing antenna sector, replace 2 existing antennas and 2 RRH units, add 2 new antennas and 2 RRH units, relocate 2 existing GPS units, install 1 new equipment cabinet, and extend the existing platform on the roof. All work in conformance with TPPN#5/98. No change in use, egress, or occupancy.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 6-story elevator apartment building built in 1912, with 72 homes, on a 15,458 sq ft lot.
- Built
- 1912
- Floors
- 6
- Residential units
- 72
- Building type
- Elevator apartment building
- Land use
- Elevator apartments
- Zoning district
- R8X
- Lot area
- 15,458 sq ft
- Building area
- 67,680 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 4, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 8 open notices on record for this building, out of 40 notices on file; the most recent was issued Aug 1, 2024.
- Failure to correct swarmp conditions (facade)
Issued Aug 1, 2024 — FAILURE TO CORRECT SWARMP CONDITIONS
- Hazardous condition (facade)
Issued Feb 21, 2024 — CYCLE 9C UNSAFE REPORT FILED
- No report and / or late filing (facade)
Issued Apr 30, 2019 — FAILED TO FILE FISP CYCLE 8C TECHNICAL REPORT BY 02/21/2019
5 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 3, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B00069771-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “LOC Issued.”
- Sign-off date recorded05
DOB lists a sign-off date for this filing.
For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 61,761 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B00069771-I1
- BBL
- 3011730001
- Postal code
- 11238 · 2707 filings
- Review type
- Standard Plan Examination
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- Empty in the source
- Proposed dwelling units
- Empty in the source