NYC DOB record · M01429162-I1

21 East 104 Street

21 East 104 Street, Manhattan, NY 10029

Alteration filing in East Harlem (South), Manhattan. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 16, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M01429162-I1

21 East 104 Street

Manhattan, NY 10029

Alteration filing · status dated Sep 14, 2026

Current record
Approved
Proposed scale
6 stories
Dwelling units
32
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M01429162-I1 as a alteration filing at 21 East 104 Street, Manhattan, NY 10029. Its latest published status category is Approved, dated Sep 14, 2026. The filing records 6 proposed stories and 32 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Sep 14, 2026
Proposed scale
6 proposed stories and 32 proposed dwelling units
Applicant of recordSee the 29 filings that name Merritt Engineering Consultants, DPC
FiledJul 27, 2026
Current recordApproved
Proposed scale6 stories
Recorded cost$447,583

What the filing says

A public-record reading of the proposed work.

Facade restoration including concrete repair, mortar repointing, masonry, sealant, lintel, window sill and terra cotta replacement. no change in use, egress or occupancy.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 6-story walk-up apartment building built in 1930, with 32 homes, on a 5,046 sq ft lot.

Built
1930
Last altered
1988
Floors
6
Residential units
32
Building type
Walk-up apartment building
Land use
Walk-up apartments
Zoning district
R7-2
Lot area
5,046 sq ft
Building area
26,100 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 16, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 3 open notices on record for this building, out of 14 notices on file; the most recent was issued Feb 20, 2025.

  • Hazardous condition (facade)

    Issued Feb 20, 2025 — CYCLE 9B UNSAFE REPORT FILED

  • Construction

    Issued Dec 19, 2024 — EMRGCY WRK ORDER: TO SECURE PUBLIC SAFETY - FISP3 FILED BY QEWI 12324 DUE TO IMMINENT HAZ CONDITIONS OBSERVED AT TIME OF INSPECTION OBSVRD CRACKED/SPALLED/LOOSE STUCCO MATERIALS, CRACKED CHIMNEY FLUE, WINDOW AC INSTALLED WITHOUT BRACKET AT EXP 1,2,3,4, (S,W,N,E ELEV). OWNER TO PROVDE IMMEDIATE/ADEQUATE SAFETY MEASURES TO ALL EXPO AS PER CODE

  • No report and / or late filing (facade)

    Issued Feb 22, 2023 — FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 16, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M01429162-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,798 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M01429162-I1
BIN
1051500
BBL
1016100009
Review type
Standard Plan Examination
Existing stories
6
Proposed stories
6
Existing dwelling units
32
Proposed dwelling units
32
General construction