What the filing says
A public-record reading of the proposed work.
Proposed installation of heavy duty sidewalk shed as per plans. live load 300 lbs per square feet. sidewalk shed shall comply with chapter #33 of the NYC building code. no change in use, occupancy, or egress under this application.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 24-story elevator apartment building built in 1963, with 326 homes, on a 120,045 sq ft lot.
- Built
- 1963
- Floors
- 24
- Residential units
- 326
- Building type
- Elevator apartment building
- Land use
- Elevator apartments
- Zoning district
- R7-1
- Lot area
- 120,045 sq ft
- Building area
- 371,890 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Nov 1, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 5 open notices on record for this building, out of 68 notices on file; the most recent was issued Oct 10, 2024.
- Hazardous condition (facade)
Issued Oct 10, 2024 — CYCLE 9C UNSAFE REPORT FILED
- Construction
Issued Aug 28, 2024 — VACATE ORDER. OBSERVED @ W & E ELEV. EXP 1&3 CRACKED/SPALLED CONCRETE BALCONIES SLABS & EXPOSED REBARS @ MULTI LOCATIONS. THESE CONDITIONS HAVE MADE THE ENTIRED BALCONIES AT W & E ELEV UNABLE TO BE OCCUPIED REMEDY: VACATE BALCONIES AT EXPOSURE 1 & 3 (W & E ELEV)
- Construction
Issued Aug 14, 2024 — EMERGENCY WORK ORDER DUE TO SEVERE CRACKS IN MULTIPLE LOCATIONS OF THE BALCONY SLABS.EXPOSURE 1 AND 3 LINE MN> AB ERECT SIDE WALK SHED IN EXPOSURES 1 AND 3 IMMEDIATELY. REMEDY PROVIDE SAFETY MEASURES AN REPAIR IMMEDIATELY
2 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Nov 1, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B01442765-I1.
- First permit date recorded02
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated03
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 91,066 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B01442765-I1
- BBL
- 3019330001
- Postal code
- 11205 · 2540 filings
- Review type
- Professional Certification
- Existing stories
- 24
- Proposed stories
- 24
- Existing dwelling units
- 327
- Proposed dwelling units
- 327