NYC DOB record · M00847771-I1

210 East 52 Street

210 East 52 Street, Manhattan, NY 10022

Alteration filing in East Midtown-Turtle Bay, Manhattan. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Oct 31, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M00847771-I1

210 East 52 Street

Manhattan, NY 10022

Alteration filing · status dated Oct 29, 2026

Current record
Approved
Proposed scale
Not stated
Dwelling units
1
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M00847771-I1 as a alteration filing at 210 East 52 Street, Manhattan, NY 10022. Its latest published status category is Approved, dated Oct 29, 2026. The filing records 1 proposed dwelling unit.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Oct 29, 2026
Proposed scale
1 proposed dwelling unit
Applicant of recordSee the 26 filings that name Gene Kaufman Architect, PC
FiledMar 22, 2023
Current recordApproved
Proposed scale1 units
Recorded cost$1,000

What the filing says

A public-record reading of the proposed work.

Hereby filing for construction fence inconjuction with nb application #120009962

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 6-story one-family home built in 2012, on a 1,004 sq ft lot.

Built
2012
Last altered
2010
Floors
6
Residential units
1
Building type
One-family home
Land use
One and two family homes
Zoning district
R8B
Lot area
1,004 sq ft
Building area
4,200 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 31, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 3 open notices on record for this building, out of 9 notices on file; the most recent was issued Mar 25, 2026.

  • Construction

    Issued Mar 25, 2026 — FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER. AS NOTED: AT TIME OF INSPECTION SAFETY NETTING AT THE BUILDING PERIMETER IS FOUND TO BE LOOSE, DAMAGED AND DETERIORATED AT SEVERAL FLOORS. REMEDY: REPAIR AND/OR REPLACE

  • Construction

    Issued Aug 11, 2025 — FAILURE TO MAINTAIN BUILDING STRUCTURE IN CODE COMPLIANT MANNER.AS NOT ED AT THE TIME OF INSPECTION,I OBSERVED ON MULTIPLE FLOORS,LOOSE DAMAG ED,BROKEN SAFETY NETTING AT THE PARAMETER OF SEVERAL FLOORS.REMEDY:REP AIR AND/OR REPLACE ALL DAMAGED NETTING

  • Construction

    Issued Mar 6, 2017 — THE BOROUGH COMMISSIONER HAS ORDERED ALL WORK STOPPED FOR NEW BUILDING APPLICATION #120009962. SUPERINTENDENT OF CONSTRUCTION WITHDREW. STOP ALL WORK, MAKE SITE SAFE. PROVIDE ALL REQUIRED INFORMATION FORTHWITH

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 31, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M00847771-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 90,393 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M00847771-I1
BIN
1088832
BBL
1013250048
Review type
Professional Certification
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
0
Proposed dwelling units
1