What the filing says
A public-record reading of the proposed work.
Application is filed for the removal and replacement of plumbing fixturesin cellar, relocation of plumbing fixtures in basement floor, new plumbingfixtures in first, and relocation of plumbing fixtures in second floor ofexisting 3-story, 2-family dwelling
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 2-story walk-up apartment building built in 1901, with 3 homes, on a 1,667 sq ft lot.
- Built
- 1901
- Floors
- 2
- Residential units
- 3
- Building type
- Walk-up apartment building
- Land use
- Walk-up apartments
- Zoning district
- R6
- Lot area
- 1,667 sq ft
- Building area
- 2,112 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 14, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 2 open notices on record for this building, out of 3 notices on file; the most recent was issued Jul 31, 2019.
- Construction
Issued Jul 31, 2019 — FTM:BLDG SUFFERED FIRE ON 7/30/19.APPX 12'DX12'W REAR OF ROOF WAS OPEN AND APPX 2' REAR ROOF FRAM&REAR EXP3 FIRE DMG FROM 1ST FL-ROOF.BRICK WALL@2FL EXP 3/4 OPEN COMPROMISED FIRE SEPARATION.REAR DECK&EXT INADEQ CONN.OWNR RETAIN PE EVAL ENTIRE BLDG&REAR DECK&1STY REAR EXT&PREP REPR PLNS,BLDG REPRD UNDER PRMT START BY 9/2/19 AND CMPL BY 10/4/19
- Construction
Issued Jul 30, 2019 — STRUCTURE RENDERED NON-COMPLIANT DUE TO FIRE. AT REAR OF BUILDING AT 2ND FLOOR EXTENSIVE CHARRING OF JOISTS, WINDOWS OUT, ROOF OPEN AND WALLS REMOVED. VACATE ENTIRE BUILDING.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B00298478-P1.
- Application approved02
The application reached an approved status in the DOB record.
- Current status updated03
The latest recorded filing status is “Approved.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 76,126 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B00298478-P1
- BBL
- 3014320041
- Postal code
- 11233 · 2279 filings
- Review type
- Standard Plan Examination
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 2
- Proposed dwelling units
- 2