What the filing says
A public-record reading of the proposed work.
Structural modifications including mezzanine demolition, removal of existing floor framing, and installation of new structural steel framing and concrete slab infill at the first floor. No change in use, egress or occupancy.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a condominium built in 1904, with 385 homes, on a 44,375 sq ft lot.
- Built
- 1904
- Residential units
- 385
- Building type
- Condominium
- Land use
- Mixed residential and commercial
- Zoning district
- R8B
- Lot area
- 44,375 sq ft
- Building area
- 435,775 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 13, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 4 open notices on record for this building, out of 274 notices on file; the most recent was issued Feb 28, 2025.
- Construction
Issued Feb 28, 2025 — FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. OBSERVED AT EXPOSURE 2 EAST ELEVATION COMMERCIAL ENTRANCE ON BROADWAY. OVER MAIN DOOR LINTEL, OPEN STONE JOINT, CRACK MASONRY & SPALLED STONE. REMEDY: REPAIR AND/OR REPLACE
- Construction
Issued Mar 4, 1992
- Construction
Issued Oct 10, 1991
1 further open notice is on file. Open the source dataset for the full list.
A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 13, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01410055-S3.
- Application approved02
The application reached an approved status in the DOB record.
- Current status updated03
The latest recorded filing status is “Approved.”
For scale: half of DOB filings are permitted within 18 days of being filed and a quarter take longer than 4 months, measured across 50,115 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01410055-S3
- BBL
- 1011657503
- Postal code
- 10023 · 304 filings
- Review type
- Professional Certification
- Existing stories
- 17
- Proposed stories
- 17
- Existing dwelling units
- 385
- Proposed dwelling units
- 385