What the filing says
A public-record reading of the proposed work.
Repair existing chimney liner for existing fireplace as per plans. no change in use, occupancy or egress.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 20-story elevator apartment building built in 1929, with 183 homes, on a 40,350 sq ft lot.
- Built
- 1929
- Last altered
- 1989
- Floors
- 20
- Residential units
- 183
- Building type
- Elevator apartment building
- Land use
- Elevator apartments
- Zoning district
- R10A
- Lot area
- 40,350 sq ft
- Building area
- 600,613 sq ft
- Historic district
- Upper West Side / Central Park West Historic District
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 2, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 3 open notices on record for this building, out of 137 notices on file; the most recent was issued Oct 10, 2019.
- Construction
Issued Oct 10, 2019 — FTM:IN VAULT SPACE AT CELLAR LEVEL.BELOW SIDE YARD ADJ TO 14 WEST 82 ST.IN ROOM DIRECTLY@BOTTOM OF STAIRS,STEP CRCKS WERE OBS.IN THE WEST& SOUTH BRICK WALLS,NEAR THE SOUTH WEST CRNR.PE IMMD EVAL STRUCT@SIDE YARD VAULT SPACE.CMPL PROBES&GEOTECH INVEST@DMG AREA.CMPL REPRSU/PRMT @DIR PE.FILE PRMT BY 12/2/19.OBT PMT&ST WRK BY 12/16/19 S/O BY 2/21/20
- Construction
Issued Oct 10, 2019 — FTM:AT SUB CELLAR LEVEL,CRACKS OBS.IN BRICK COLUMN ENCASEMENT@BASE OF MULTI STEEL COLUMNS,INDICAT CORROSSION OF STEEL COLUMNS.LARGE CRACK IN CONC IN VAC PUMP ROOM CRNR IN CONC WALL&SLABS HAVE SPALLS.PE EVAL ALL COND ABOVE&IMPLEMENT ANY IMMD SAFTY MEASURE.CMPL REPRS UNDER PRMTWITH FILING BY 12/23/19,WRK STRT BY 1/6/20 WRK CMPL UND PRMT&S/O BY 5/25/20
- Elevator
Issued Apr 12, 2013
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 2, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01295961-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “LOC Issued.”
- Sign-off date recorded05
DOB lists a sign-off date for this filing.
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 73,707 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01295961-I1
- BBL
- 1011950029
- Postal code
- 10024 · 477 filings
- Review type
- Professional Certification
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 183
- Proposed dwelling units
- 183








