What the filing says
A public-record reading of the proposed work.
Filing herewith for interior renovation of first floor lobby area. Remove and install new non load bearing partitions, fixtures and finishes. Replacement of exterior canopy.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 16-story health facility built in 1967, on a 21,995 sq ft lot.
- Built
- 1967
- Floors
- 16
- Residential units
- 0
- Building type
- Health facility
- Land use
- Public facilities and institutions
- Zoning district
- R10A
- Lot area
- 21,995 sq ft
- Building area
- 170,000 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Nov 7, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 6 open notices on record for this building, out of 88 notices on file; the most recent was issued Feb 22, 2022.
- No report and / or late filing (facade)
Issued Feb 22, 2022 — FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022
- Construction
Issued Sep 28, 2019 — THE BOROUGH COMMISSIONER HAS ISSUE A STOP WORK ORDER FOR PERMIT # M00002235 DUE TO INTENT TO REVOKE APPROVAL AND PERMIT, STOP ALL WORK AND MAKE SITE SAFE.
- Elevator
Issued Mar 21, 2001 — 1P27630
3 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 25, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01297529-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 93,320 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01297529-I1
- BBL
- 1015250005
- Postal code
- 10075 · 491 filings
- Review type
- Standard Plan Examination
- Existing stories
- 17
- Proposed stories
- 17
- Existing dwelling units
- 0
- Proposed dwelling units
- 0








