What the filing says
A public-record reading of the proposed work.
Installation of 300psf sidewalk shed as per plans. all equipment shall comply with ch #33 of the NYC code 2022. no change in use, occupancy or egress under this application.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 1-story office building built in 1935, on a 10,000 sq ft lot.
- Built
- 1935
- Last altered
- 1985
- Floors
- 1
- Residential units
- 0
- Building type
- Office building
- Land use
- Commercial and office
- Zoning district
- R4
- Lot area
- 10,000 sq ft
- Building area
- 10,000 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 1, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 3 open notices on record for this building, out of 3 notices on file; the most recent was issued Aug 15, 2025.
- Immediate
Issued Aug 15, 2025 — INSTALL APPROXIMATELY 30 LINEAR FEET OF SIDEWALK SHED ALONG THE EXPOSURE 4(EAST 22 ST) SIDE BY NORTHEAST END, PROVIDING PROTECTION FOR THE TWO ENTRY DOORS. SIDEWALK SHED SHALL WRAP AROUND EXPOSURE 3 AN ADDITIONAL 8 LINEAR FEET FOR PROTECTION
- Construction
Issued Aug 14, 2025 — FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER; OBSERVED AT EXP 1 AND 4 SEVERE CRACKS IN BUILDINGS CONCRETE WALLS. CRACKS APPROX 1/2" WIDE. CORNER OF EXP 3/4 HAVE STEP CRACKS IN MASONRY BRICKS AND ERODED MORTAR JOINTS ALLOWING WEATHER ELEMENTS TO SEEP IN AND CAUSE FURTHER DAMAGE.
- Fail to certify class
Issued Apr 13, 2022 — FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B01274443-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,798 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B01274443-I1
- BIN
- 3202202
- BBL
- 3074050136
- Postal code
- 11235 · 1783 filings
- Review type
- Professional Certification
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 2
- Proposed dwelling units
- 2