What the filing says
A public-record reading of the proposed work.
Renovation of apartment 14d to include new partitions and doors,and new ventilation fan. as per plans herewith submitted. no change in use, egress or occupancy.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 34-story condominium built in 1979, with 261 homes, on a 17,812 sq ft lot.
- Built
- 1979
- Floors
- 34
- Residential units
- 261
- Building type
- Condominium
- Land use
- Mixed residential and commercial
- Zoning district
- C5-3
- Lot area
- 17,812 sq ft
- Building area
- 244,862 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 17, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 6 open notices on record for this building, out of 81 notices on file; the most recent was issued Jun 30, 2023.
- High pressure boiler
Issued Jun 30, 2023 — VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL HGH PRESSURE INSPECTION
- High pressure boiler
Issued Jun 30, 2023 — VIOLATION ISSUED-FAILURE TO FILE 2020 INTERNAL HGH PRESSURE INSPECTION
- High pressure boiler
Issued Jun 20, 2023 — VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL HGH PRESSURE INSPECTION
3 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 17, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M00720098-P3.
- Current status updated02
The latest recorded filing status is “Plan Examiner Review.”
For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 63,690 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M00720098-P3
- BIN
- 1037599
- BBL
- 1013207506
- Postal code
- 10017 · 410 filings
- Review type
- Standard Plan Examination
- Existing stories
- 34
- Proposed stories
- 34
- Existing dwelling units
- 261
- Proposed dwelling units
- 261








