NYC DOB record · B00323293-I1

2135 58 Street

2135 58 Street, Brooklyn, NY 11204

Alteration filing in Mapleton-Midwood (West), Brooklyn. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 12, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B00323293-I1

2135 58 Street

Brooklyn, NY 11204

Alteration filing · status dated Mar 12, 2021

Current record
Approved
Proposed scale
Not stated
Dwelling units
2
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B00323293-I1 as a alteration filing at 2135 58 Street, Brooklyn, NY 11204. Its latest published status category is Approved, dated Mar 12, 2021. The filing records 2 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Mar 12, 2021
Proposed scale
2 proposed dwelling units
Applicant of recordSee the 308 filings that name H & O Engineering, DPC
FiledJun 30, 2020
Current recordApproved
Proposed scale2 units
Recorded cost$160

What the filing says

A public-record reading of the proposed work.

Proposed construction fence. no change to use, egress or occupancy under this application.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B00323293-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

For scale: half of DOB filings are permitted within 18 days of being filed and a quarter take longer than 4 months, measured across 50,115 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B00323293-I1
BIN
3131324
BBL
3055010060
Review type
Professional Certification
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
2
Proposed dwelling units
2