NYC DOB record · M01446567-I1

214 7 Avenue

214 7 Avenue, Manhattan, NY 10011

Alteration filing in Chelsea-Hudson Yards, Manhattan. The latest DOB status is objections.

The examiner raised objections. The applicant has to resolve them before the filing can be approved. What every status means

Under reviewAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 2, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M01446567-I1

214 7 Avenue

Manhattan, NY 10011

Alteration filing · status dated Aug 28, 2026

Current record
Under review
Proposed scale
Not stated
Dwelling units
Not stated
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M01446567-I1 as a alteration filing at 214 7 Avenue, Manhattan, NY 10011. Its latest published status category is Under review, dated Aug 28, 2026. The published record does not state proposed stories or dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Under review
Latest status date
Aug 28, 2026
Proposed scale
Not stated in this filing
Applicant of recordSee the 3 filings that name Avenue Contracting Inc
FiledAug 17, 2026
Current recordUnder review
Proposed scaleNot specified
Recorded costNot published

What the filing says

A public-record reading of the proposed work.

Outrigger for facade repair.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 6-story elevator apartment building built in 1890, with 40 homes, on a 4,937 sq ft lot.

Built
1890
Floors
6
Residential units
40
Building type
Elevator apartment building
Land use
Mixed residential and commercial
Zoning district
R8A
Lot area
4,937 sq ft
Building area
22,974 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 3, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 17 open notices on record for this building, out of 24 notices on file; the most recent was issued Aug 4, 2026.

  • Construction

    Issued Aug 4, 2026 — FAILURE TO COMPLY W/COMMISSIONER'S ORDER #350610(052026FEU10402PN) DATED 05/20/2026 REQUIRING OWNRSHIP TO PERM RPAIR THE BLDG UNDR PERMIT &CMPLTD/SGND OFF BY 07/31/26.AS OF 08/04/26,DOB HAS NOT RECEIVED ANY PE RPRTS OF WRK TO STBLZE THE EXP2 WALL&THERE ARE NO RELATED JOB FILINGS W/DOB.IMMED COMPLY W/COMMISSIONER'S ORDER#350610(052026FEU1040

  • Construction

    Issued Aug 4, 2026 — EMERGENCY WORK ORDER.EXP2 LOAD BEARNG MASNRY WALL HAS A SEVERE THRU- WALL STEP CRCK@EXP1/2 CRNR EMANATNG FRM 6THFL TO TOP OF PARAPET INTERIOR FACE OF EXP2 PARAPET WAS CRCKD@PREVIOUSLY PATCHD AREA.TOP OF EXP1/2 WALL CRNR INADEQUATELY BRACD&STRCTRLLY CMPRMSD.OWNR TO RETAIN DOB REG GC TO IMMED INSTLL SDWLK SHED@EXP1ALNG 7AVE W/MIN 12FT EXTNSN

  • Construction

    Issued Jun 24, 2026 — FAILURE TO COMPLY W/COMMISSIONER'S ORDER #350609(052026FEU10401PN) DATED 5/20/26 REQUIRNH THE EXP2 WALL@6THFL TO THE TOP OF THE PARAPET@ EXP1/2 CRNR TO BE TEMP BRACD&STBLZD UNDR FLLTME ONSITE NYSPE SPRVSN W/ MEANS&METHDS SUBMITTD FOR APPRVL TO FEU IMMED.WRK REQ'D TO STRT IMMED UPON APPRVL 6DAYS/WEEK W/DAILY RPRTS SENT TO FEU

  • 14 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M01446567-I1.

    01
  2. Current status updated

    The latest recorded filing status is “Objections.”

    02

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 74,561 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M01446567-I1
BIN
1078604
BBL
1007720045
Review type
Standard Plan Examination
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
Empty in the source
Proposed dwelling units
Empty in the source