What the filing says
A public-record reading of the proposed work.
Proposed one (1) new two (2) story, two (2) family dwelling with ground floor residential zero lot line building obtain new certificate of occupancy.
Street Futures classifies this record as a new building based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a garage or fuel station on a 2,750 sq ft lot.
- Residential units
- 0
- Building type
- Garage or fuel station
- Land use
- Parking facilities
- Zoning district
- R3A
- Lot area
- 2,750 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 3, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 2 open notices on record for this building, out of 2 notices on file; the most recent was issued Aug 8, 2024.
- Immediate
Issued Aug 8, 2024 — REMEDY; INSTALL APPROX 110LF OF CONSTRUCTION FENCE AT EXPO 2 AND APPRO X 25LF OF CONSTRUCTION FENCE AT EXPOS 1 & 3 TP ENCLOSE TH EPOTENTIAL C OLLAPSE ZONE
- Construction
Issued Aug 8, 2024 — STRUCTURE RENDERED NON COMPLIANT ADJACENT BUILDING AT EXPOSURE # 2 216 HUSSON AVENUE IS IN DISREPAAIR CONDITION WITH THE EXTERIOR WALL A T EXPOSURE 4 PARTIALLY COLLAPSED AND POTENTIAL FOR FURTHER COLLAPSE IN TO YARD OF 214 HUSSON AVENUE. VACATE ENTIRE LOT
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 2, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing X01254146-P1.
- Current status updated02
The latest recorded filing status is “Plan Examiner Review.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 75,309 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- X01254146-P1
- BIN
- 2020304
- BBL
- 2034600012
- Postal code
- 10473 · 145 filings
- Review type
- Standard Plan Examination
- Existing stories
- Empty in the source
- Proposed stories
- 2
- Existing dwelling units
- Empty in the source
- Proposed dwelling units
- 2