What the filing says
A public-record reading of the proposed work.
Installation of outrigger for the facade repair work as per plan submitted.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
Violation record
Are there open violations here?
The Department of Buildings has 18 open notices on record for this building, out of 40 notices on file; the most recent was issued Nov 1, 2024.
- Immediate
Issued Nov 1, 2024 — IMMEDIATELY INSTALL250' LINEAR FEET OF SIDEWALK SHED AT EAST ELEVATION (HOLLAND AVE) ICLUDING THE ENTRANCE COURTYARD AND 100' LINEAR FEET OF SIDEWALKSHED AT SOUTH ELEVATION (LYDIG AVE) AS PER 1 RCNY 103.04
- Construction
Issued Oct 21, 2024 — EMERGENCY WORK ORDER DUE TO CRACKED/BROKEN WINDOW GLASS AT EXP #1 EAST , 2 @ 6FL,1 AT 4FL. REMEDY: IMMEDIATELY TAKE AND PROVIDE ADEQUATE SAFETY MEASURES TO SECURE AND PROTECT THE PUBLIC AT EXP#1 EAST AND IMMEDIATELY REPAIR/REPLACE BROKEN WINDOWS
- Low pressure boiler
Issued Jun 30, 2023 — VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION
15 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Nov 6, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing X01473820-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 92,577 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- X01473820-I1
- BIN
- 2049410
- BBL
- 2043190050
- Postal code
- 10462 · 296 filings
- Review type
- Standard Plan Examination
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- Empty in the source
- Proposed dwelling units
- Empty in the source