What the filing says
A public-record reading of the proposed work.
These drawings and specifications are for the installation of four electric hot water heaters as well as domestic water, sanitary, and gas piping.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 1-story one-family home built in 1938, with 1887 homes, on a 12,253,428 sq ft lot.
- Built
- 1938
- Floors
- 1
- Residential units
- 1887
- Building type
- One-family home
- Land use
- One and two family homes
- Zoning district
- R4
- Lot area
- 12,253,428 sq ft
- Building area
- 1,600,000 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 10, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 5 open notices on record for this building, out of 5 notices on file; the most recent was issued Apr 23, 2025.
- Construction
Issued Apr 23, 2025 — PREMISES WAS DMGD B A FIRE WHICH OCCURRD ON 4/19/25,CAUSING CHARRNG TO ROOF,ROOF TRUSSES&PARTIAL WALL AT EXP3.ROOF&WALLS OPEN LOOSE MATERIAL IN DANGER OF PARTIAL COLLAPSE.OWNR TO IMMED ENGAGE NYSPE&DEMO ENDRSD CNTRCTR TO INSTALL SHORNG@COMPROMISD ROOF TRUSSES,PRTL DEMO OF COMPRMSD ROOF
- Construction
Issued Apr 23, 2025 — FAILURE TO MAINTAIN.PREMISES WAS DAMAGED BY A FIRE WHICH OCCURRED ON 4/19/2025,CAUSNG CHARRNG TO ROOF,ROOF TRUSSES,&PARTIAL WALL@EXP3.ROOF& WALLS OPEN.LOOSE MATERIAL IN DANGER OF PARTIAL COLLAPSE.OWNR TO ENGAGE NYSPE&ENDRSD CNTRCTR TO EVAL THE ENT BLDG&RPAIR UNDR PRMT.FILE FOR PRMTS BY 6/23/25.SGN OFF RPAIRS 8/25
- Construction
Issued Apr 21, 2025 — EMERGENCY WORK ORDER.PREMISES WAS DMGD BY A FIRE WHICH OCCURRD ON 4/19/25,CAUSNG CHARRNG TO ROOF&WALLS@FRONT OF CHURCH.ROOF&WALLS OPEN LOOSE MATERIAL IN DANGER OF FALLING.OWNR TO IMMED ENGAGE NYSPE&ENDRSD CNTRCTR TO INSTALL A TGHTBRD CNSTRCTN FENCE ARND THE PERIMETER OF THE BLDG
2 further open notices are on file. Open the source dataset for the full list.
A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing Q01330588-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 18 days of being filed and a quarter take longer than 4 months, measured across 50,115 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- Q01330588-I1
- BIN
- 4619748
- BBL
- 4163500400
- Postal code
- 11697 · 12 filings
- Review type
- Professional Certification
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 0
- Proposed dwelling units
- 0