What the filing says
A public-record reading of the proposed work.
This application is filed to address violation #39173719J
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 6-story elevator apartment building built in 1932, with 92 homes, on a 24,570 sq ft lot.
- Built
- 1932
- Floors
- 6
- Residential units
- 92
- Building type
- Elevator apartment building
- Land use
- Mixed residential and commercial
- Zoning district
- R7-1
- Lot area
- 24,570 sq ft
- Building area
- 124,896 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 22, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 20 open notices on record for this building, out of 68 notices on file; the most recent was issued Jan 14, 2026.
- Construction
Issued Jan 14, 2026 — REQUESTING FOR STRUCTURE STABILITY REPORT TO ASSESS THE CEILING IN LIVING ROOM EXHIBITING A LARGE SECTION THAT IS BOWING AND COULD HAVE THE POTENTIAL FOR COLLAPSING.
- Fail to certify class
Issued Dec 11, 2024 — FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
- Fail to certify class
Issued Sep 12, 2024 — FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
17 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 22, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing X01377173-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,798 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- X01377173-I1
- BIN
- 2018266
- BBL
- 2033440036
- Postal code
- 10467 · 149 filings
- Review type
- Standard Plan Examination
- Existing stories
- 6
- Proposed stories
- 6
- Existing dwelling units
- 91
- Proposed dwelling units
- 91