What the filing says
A public-record reading of the proposed work.
Filing herewith for temporary shoring of sidewalk vaults structure. No change to egress, use, or occupancy.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 4-story educational building built in 1892, on a 15,062 sq ft lot.
- Built
- 1892
- Last altered
- 1950
- Floors
- 4
- Residential units
- 0
- Building type
- Educational building
- Land use
- Public facilities and institutions
- Lot area
- 15,062 sq ft
- Building area
- 33,497 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 15, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 2 open notices on record for this building, out of 27 notices on file; the most recent was issued Aug 31, 2022.
- Construction
Issued Aug 31, 2022 — FTM BLDG IN CODE COMPLIANT MANNER. OBSERVED DAMAGED/LOOSE METAL AND CORRION AT ROOF(VIEW FROM STREET)SPALLING, OPEN JOINT AT ROOF CORNICE AND MULTIPLE CRACK MASONRU, BROEKN STONES AT 1FL. REMEDY: REPAIR AND OR REPLACE
- Construction
Issued Aug 16, 2021 — FTM BLDG EXTERIOR FACADE AND APPURTENANCES. AT NORTH ELEVATION EXP3 OBSERVED MISSING STONE BLOCK ABOVE THE GROUND GATE EAST CORNER ALSO OBSERVED CRACKED STONE ABOVE THIS GATE UNDER SIDEWALK SHED. REMEDY: MAINTAIN EXTERIOR FACADE, PROVIDE SAFETY MEAURES, REPAIR DEFECTIVE FACADE AS PER 1 RCNY 103-04
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 21, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01420562-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 76,126 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01420562-I1
- BIN
- 1080846
- BBL
- 1010290023
- Postal code
- 10019 · 789 filings
- Review type
- Standard Plan Examination
- Existing stories
- 5
- Proposed stories
- 5
- Existing dwelling units
- 0
- Proposed dwelling units
- 0