What the filing says
A public-record reading of the proposed work.
Brick crack repair, sill repair and stucco repair work as per plan. no change in use, egress or occupancy shall comply with chapter#33 of 2022 the ny building code.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 6-story elevator apartment building built in 1939, with 56 homes, on a 14,107 sq ft lot.
- Built
- 1939
- Floors
- 6
- Residential units
- 56
- Building type
- Elevator apartment building
- Land use
- Elevator apartments
- Zoning district
- R8
- Lot area
- 14,107 sq ft
- Building area
- 54,570 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 28, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 20 open notices on record for this building, out of 65 notices on file; the most recent was issued Aug 1, 2026.
- Construction
Issued Aug 1, 2026 — EMERGENCY WORK ORDER DUE TO LOOSE/DISLODGED MASONRY @ MULT LOCS & FL LVLS UNSAFE CONDITIONS & DETERIORATED MASONRY ABOVE ALLEYWAY/COURTYARD REMEDY:OWNER ORDERED TO IMMED REMOVE & SECURE ALL LOOSE & UNSTABLE MASONRY & IMPLEMENT NECESSARY PUBLIC PROTECTION MEAS. ALL EMERG STAB & REPAIR WORK U/SUPV OF NYS LICENSED DESIGN (QEWI)
- Low pressure boiler
Issued Nov 14, 2025 — VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
- Fail to certify class
Issued Dec 11, 2024 — FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
17 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 28, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing X01091123-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 71,094 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- X01091123-I1
- BBL
- 2031570059
- Postal code
- 10457 · 245 filings
- Review type
- Professional Certification
- Existing stories
- 6
- Proposed stories
- 6
- Existing dwelling units
- 56
- Proposed dwelling units
- 56