NYC DOB record · B00394259-I1

218 Cumberland Street

218 Cumberland Street, Brooklyn, NY 11205

Alteration filing in Fort Greene, Brooklyn. The latest DOB status is loc issued.

DOB has issued a Letter of Completion, which records that the work in this filing is finished. What every status means

Recorded as completedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 12, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B00394259-I1

218 Cumberland Street

Brooklyn, NY 11205

Alteration filing · status dated Mar 1, 2021

Current record
Recorded as completed
Proposed scale
Not stated
Dwelling units
10
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B00394259-I1 as a alteration filing at 218 Cumberland Street, Brooklyn, NY 11205. Its latest published status category is Recorded as completed, dated Mar 1, 2021. The filing records 10 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Recorded as completed
Latest status date
Mar 1, 2021
Proposed scale
10 proposed dwelling units
The building, not the filingwhat it sold for, apartment sizes, the owner of record and every filing at BIN 3058964Applicant of recordSee the 132 filings that name Billah Engineering
FiledSep 29, 2020
Current recordRecorded as completed
Proposed scale10 units
Recorded cost$22,500

What the filing says

A public-record reading of the proposed work.

Renovation of existing first floor apartment with plumbing work:relocate kitchen and replace bathroom fixtures; no change in use,egress or occupancy under this application.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 5-story walk-up apartment building built in 1895, with 10 homes, on a 2,200 sq ft lot.

Built
1895
Floors
5
Residential units
10
Building type
Walk-up apartment building
Land use
Walk-up apartments
Zoning district
R6B
Lot area
2,200 sq ft
Building area
8,800 sq ft
Historic district
Fort Greene Historic District

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 14, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 4 open notices on record for this building, out of 8 notices on file; the most recent was issued Sep 23, 2024.

  • Low pressure boiler

    Issued Sep 23, 2024 — VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION

  • Low pressure boiler

    Issued Jun 20, 2023 — VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION

  • Low pressure boiler

    Issued Jun 20, 2023 — VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION

  • 1 further open notice is on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B00394259-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “LOC Issued.”

    04
  5. Sign-off date recorded

    DOB lists a sign-off date for this filing.

    05

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 74,561 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B00394259-I1
BBL
3021010041
Review type
Professional Certification
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
10
Proposed dwelling units
10
plumbing