NYC DOB record · X01464874-I1

2187 Cruger Avenue

2187 Cruger Avenue, Bronx, NY 10462

Alteration filing in Pelham Parkway-Van Nest, Bronx. The latest DOB status is pending plan examiner assignment.

The filing is waiting for DOB to assign an examiner. Review has not started. What every status means

Under reviewAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 29, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · X01464874-I1

2187 Cruger Avenue

Bronx, NY 10462

Alteration filing · status dated Sep 25, 2026

Current record
Under review
Proposed scale
Not stated
Dwelling units
Not stated
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing X01464874-I1 as a alteration filing at 2187 Cruger Avenue, Bronx, NY 10462. Its latest published status category is Under review, dated Sep 25, 2026. The published record does not state proposed stories or dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Under review
Latest status date
Sep 25, 2026
Proposed scale
Not stated in this filing
Applicant of recordSee the 1 filings that name Java Builders Inc
FiledSep 24, 2026
Current recordUnder review
Proposed scaleNot specified
Recorded costNot published

What the filing says

A public-record reading of the proposed work.

Suspended scaffold out rigger system for facade repair works .

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 6-story elevator apartment building built in 1930, with 78 homes, on a 21,650 sq ft lot.

Built
1930
Floors
6
Residential units
78
Building type
Elevator apartment building
Land use
Elevator apartments
Zoning district
R7-1
Lot area
21,650 sq ft
Building area
81,984 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 29, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 6 open notices on record for this building, out of 26 notices on file; the most recent was issued Dec 9, 2024.

  • Construction

    Issued Dec 9, 2024 — PARTIAL VACATE ORDER DUE TO HAZARDOUS CONDITIONS OBSERVED SUCH AS MULTIPLE AREAS OF BULGING MASONRY NUMEROUS STEP CRACKING, SPALLING MORTAR JOINTS AND CRACKED WINDOWS. REMEDY: VACATE COURTYARD AT EXP#2 S.ELEV, EXP#3 W.ELEV, EXP#4 N.ELEV

  • Construction

    Issued Dec 3, 2024 — EMERGENCY WORK ORDER DUE TO HAZARDOUS MATERIAL AT EXPOSURE #1 MULTIPLE STEP CRACKS THAT ARE AT MULTIPLE LEVELS OF THE FACADE, SPALLING MORTAR JOINTS AT THE WHOLE FACADE. BULGING BRICKS @ WINDOW & VERTICAL BRICK CRACKS.REMEDY: IMMEDIATELY TAKE AND PROVIDE SAFETY MEASURES AT EXPOSURE 1 UNDER THE SUPERVISION OF A LICENSED PROFESSIONAL

  • Fail to certify class

    Issued Oct 3, 2018 — FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION

  • 3 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 29, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing X01464874-I1.

    01
  2. Current status updated

    The latest recorded filing status is “Pending Plan Examiner Assignment.”

    02

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 75,309 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
X01464874-I1
BIN
2049399
BBL
2043180036
Review type
Standard Plan Examination
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
Empty in the source
Proposed dwelling units
Empty in the source